Keep your session open?
Ending In 
Your shopping session has expired.
Your session has expired. For your security, we have logged you out.
Would you like to log in again?

Validation & packaging

Masterflex single-use advantage

Managing the quality and risk of your single-use systems

Shop assemblies

Masterflex, part of Avantor, supports a quality and risk management program that allows customers in the biopharmaceuticals industry to purchase disposable, custom-designed bioprocess assemblies, eliminating the need for these manufacturers to track inventory or self-validate.

The process of ordering, assembling, sterilizing and validating bioprocess systems now requires just one call to us. Select from a wide range of brand-name tubing, fittings, filters and container systems. Order assemblies nonsterile or gamma-sterilized. All assemblies have full lot traceability and are manufactured in an ISO Class 7 (Class 10000) cleanroom. The manufacturing facility is ISO 13485 certified and cGMP compliant.


Sterility validation you can rely on


Packaged for safety and ease

Validated packaging
Masterflex packaging has been tested and validated to stringent guidelines, to ensure that the assemblies will withstand the rigors of shipping to arrive sterile at your facility. 

Shelf-stable
Once they are in your facility, we have tested that the packaging will keep the product sterile to allow flexibility to choose when you want to use the assemblies – use them immediately or use them 2 years later – either way our validated package testing can attest to the sterility level of the assemblies.

Detailed labelling
When the product arrives at your facility you will experience the ease of integrating single-use assemblies seamlessly into your procurement system. The detailed label will contain the information you have specified to ensure the assemblies can be received quickly without requesting more information.

Sterile components